BSCI has another job for you at Acme Manufacturing Co., and Bob Sanders (your supervisor) has asked you to complete it. BSCI has been contracted

BSCI has another job for you at Acme Manufacturing Co., and Bob Sanders (your supervisor) has asked you to complete it. BSCI has been contracted by Acme Manufacturing Co. to collect measurements of various industrial storage facilities and certain aspects of its fire suppression system. After collecting field measurements and calculating values, prepare a written report for Bob Sanders (CSP) to present to the Board of Directors. During your field investigations, you find the following field observations: A piping system repair must be made to a vertical piping system. Prior to its turn to a horizontal direction, the pipe is 18 inches in diameter and 60 ft. long. There is a repair that must be done at 35 feet above the floor. The pipe is filled with a liquid having the same properties as water. Due to operational considerations, the pipe cannot be drained. The fluid is considered non-hazardous due to its chemical properties. Before the repair can be completed, a decision has to be made about the material to use and the method in which the repair can occur safely. At the location of the pipe repair, what is the pressure of the fluid? Some repairs have been made to the existing water storage tank. New valves and piping systems are to be installed in the distribution system. You have been asked to calculate the velocity of the fluid through the bottom drain opening and prior to entry into the distribution system. This velocity will to determine the specific valve that must be installed prior to the distribution system. The tank at its highest point is 24 feet. Determine the velocity of the fluid at fluid heights of 24 feet, 18 feet, 12 feet, and 6 feet. In a horizontally installed piping system, water flows through a 10-inch pipe. The head loss in a 500-foot section is 40 feet. The residual pressure at is 55 psi and the velocity at is 7 ft./s. If the velocity at is 8.5 ft/s, what is the residual pressure at ? Respond to the details in each section, and format your report in APA style. Include each of the following in your report for this unit:

Need your ASSIGNMENT done? Use our paper writing service to score better and meet your deadline.


Click Here to Make an Order Click Here to Hire a Writer